Detailed ETAP modelling and analysis of industrial and utility electrical networks, giving you confidence that your system is correctly sized, safe and ready for expansion.
Plant expansions, new transformers, generators and solar plants all change how your electrical system behaves. Without studies, cables overheat, breakers are under-rated and protection fails to clear faults properly.
DCPS builds an accurate ETAP model of your network from single-line diagrams, nameplate data and site surveys, then runs the studies your project needs. We apply international standards such as IEC 60909 for short circuit and IEEE 1584 for arc flash, and translate the results into clear, practical recommendations.
The validated model is handed over to you, so it can be reused for future modifications, audits and operator training.
Individual studies or a complete study package for new projects and existing facilities.
Bus voltages, branch loading and losses under normal and contingency operating scenarios.
Fault currents to IEC and ANSI methods and verification of switchgear and breaker ratings.
Incident energy calculation, PPE categories and arc flash labels to improve worker safety.
Voltage dip and acceleration analysis for large motor starts and starting method selection.
Harmonic distortion assessment and filter design for networks with drives and non-linear loads.
Generator and system behaviour during faults, load rejection and switching events.
SLDs, equipment data and site survey to capture the network accurately.
Network modelled in ETAP and checked against measured values.
Required studies run for all relevant operating scenarios.
Issues identified with practical, prioritized corrective actions.
Report presentation and delivery of the ETAP model files.
Each study ends with a clear report, supporting calculations and the model itself.
Single-line diagrams, transformer, cable, generator, motor and breaker data are the starting point. Where data is missing, our team collects it during a site survey.
Yes. The model is handed over so it can be updated as your system changes.
Duration depends on network size and the number of studies. Most industrial studies take a few weeks from data collection to final report.
It quantifies the energy a worker could be exposed to during a fault, sets the correct PPE and often reveals protection settings that can reduce the hazard.
Protection studies that enhance system safety, fault management and reliable operation of electrical networks.
Learn MoreComprehensive power system studies using PowerFactory for accurate modelling, analysis and optimization.
Learn MorePower system analysis using PSS®E to evaluate grid performance, stability and system reliability.
Learn MoreSend us your single-line diagram and we will scope the right ETAP studies. Call +92 345 2270942 or email info@dcpspak.com.